Composite Materials Systems - Classification and Qualification
Home Background Qualification Scheme Classification Scheme Quality Control Protocols and Acceptance Outputs and Downloads Links

Technical Report No. 8 - Case Studies

    Download complete report (80 page pdf document)

    or individual case studies from the report:

   Overview

1. St Thomas' Hospital

2. Trenchard Street Multistorey Car Park

3. Maunders Road Bridge

4. Ealing Road Bridge

5. St. Micheal's Road Underbridge

6. New Moss Road Overbridge

7. Brockley Slip Roads

8. QAFCO PRILL Tower

9. Hammersmith Road Bridge


QC Procedures

Please click on the links below to download procedure sheets.
Files are in PDF format.

Procedures for sample preparation for off-site testing


Procedures for conducting on-site QC tests

 

Classification

 

Website designed and maintained by PC Net Services. This page last updated: Mar 7th, 2011

Outputs and Downloads

The following documents are in pdf format. If you do not have a PDF reader then click here to download one for free.